Chandigarh–Shimla Expressway
Dear reader, We need your support to keep the flame of knowledge burning bright! Our hosting server bill is due on June 1st, and without your help, Bharatpedia faces the risk of shutdown. We've come a long way together in exploring and celebrating our rich heritage. Now, let's unite to ensure Bharatpedia continues to be a beacon of knowledge for generations to come. Every contribution, big or small, makes a difference. Together, let's preserve and share the essence of Bharat.
Thank you for being part of the Bharatpedia family! 0% transparency: ₹0 raised out of ₹100,000 (0 supporter) |
Shimla Chandigarh Expressway | |
---|---|
Route information | |
Length | 120 km (70 mi) |
Major junctions | |
From | Chandigarh |
To | Shimla |
Location | |
States | Himachal Pradesh, Chandigarh |
Highway system | |
|
The Shimla Chandigarh Expressway is an under construction 120 kilometres (75 mi)[1] long expressway connecting Chandigarh to Shimla. The four laning project involves the creation of 11 tunnels between Maliana (Shimla) and Kothi to help reduce the distance by 19 km. The total length of the tunnels will be 9.5 km. The two longest tunnels will be of 2.27 km each between Taradevi and Shogi and Kandaghat and Solan. The state government wants that the highway be realigned and include more tunnels to reduce the distance by another 20 km. The Himalayan expressway stretch of it was opened in June 2021.[2]
References[edit]
- ↑ IANS, 17 Nov 2005, 09.51am IST (17 November 2005). "Chandigarh to Shimla in two hours - The Times of India". Timesofindia.indiatimes.com. Retrieved 16 September 2010.
{{cite web}}
: CS1 maint: multiple names: authors list (link) - ↑ Service, Tribune News. "39 km Parwanoo-Solan stretch on Shimla highway opened". Tribuneindia News Service. Retrieved 28 June 2021.